Product Dose

All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials. New galvanised iron must be allowed to weather for at least six months prior to application.

When used as a protective coating, use directly from the container with a brush, broom or spray (55kPa pressure in pot and 275kPa pressure at gun). When used as an adhesive for Malthoid, first loose lay Malthoid in position. Turn back the layer (approx. half way), paint the exposed metal with Bitumen Paint, then apply a coating of Bitumen Paint to the underside of the Malthoid. Place the sheet in position again and rub out to remove air pockets. Repeat this operation with the remainder of the sheet. To provide increased durability in external application, allow to dry for 14 days and apply a reflective paint, eg Tremco Alumicool, Tennis Court Paint etc.

BITUMEN PAINT Manufacturer